Project · Cost · Construction management

Control every detail of what you build.

We work out what your building will really cost and how long it will really take, then hold that line all the way to handover. Independent project, cost and construction management.

10+
clients across Ireland,
Norway and the EU
HAPERTY SITE PRACTICAL COMPLETION
What we do

Total control, end to end.

All six services
S01DELIVERY

Project & Construction Management

We hold the programme, the trades and the client interface in one place, from mobilisation to handover and defects close-out.

Hover for what lands on your desk

  • One programme everyone works to
  • Weekly site report you can read in five minutes
  • Handover and defects close-out tracked to zero
S02COMMERCIAL

Cost & Commercial Management

Estimates you can build a business case on, then the discipline to hold them.

Hover for what lands on your desk

  • Cost plan with the assumptions written down
  • Monthly cost report and cashflow
  • Change priced before it is instructed
S03CONTROLS

Planning & Project Controls

Baselines, earned value, risk registers and reporting that say where the project really is.

Hover for what lands on your desk

  • Baseline programme and critical path
  • Risk register with owners and dates
  • Progress measured, not estimated
S04ADVISORY

Feasibility & Procurement

Before you commit: what the site can take, what it will cost, and how the work is best packaged and let.

Hover for what lands on your desk

  • Feasibility view with the real constraints
  • Procurement strategy and package plan
  • Tender review and a recommendation
What a delay actually costs you

One job runs late. Watch what happens to your opening date.

Everyone on a site has said "it'll be grand" about a slipping date. Here is how you tell when they are right.

Keep scrolling — the bars move with you

01

The plan

A building goes up in order: groundwork, frame, roof, windows, fit-out, handover. None can start until the one before finishes. Add them up and you have your opening date.

02

One job runs over

The roof takes two weeks longer than planned. Bad weather, a late delivery, a design query. It does not matter why. Watch what happens to everything after it.

03

The date moves with it

Every job behind the roof shifts by the same two weeks. Nobody after the roofer did anything wrong. They simply could not start. Your opening date is now week 50.

04

But not every job does that

Landscaping runs alongside the building and has four weeks of slack built in. It also ran two weeks over, and the opening date did not move at all.

05

That is the whole job

Most jobs behave like the roof; only a handful behave like the landscaping. We work out which is which in week one, so when something slips we can tell you within the hour whether it costs you money.

WEEK 0W12W24W36WEEK 48
THE BUILDING  ·  these six jobs have to run one after another
GroundworkW0–W8
FrameW8–W18
RoofW18–W24
WindowsW24–W32
Fit-outW32–W43
HandoverW43–W48
+2 WEEKS
THE LANDSCAPING  ·  this one runs at the same time, on its own
LandscapingW30–W36
4 WEEKS SPARE
+2 WEEKS
THE DAY YOU OPEN WEEK 48 was week 48
Quick check

Is your project ready?

Two minutes, no forms. One tells you whether we are a good match, the other gives you a rough size and cost.

01Are we a good match?

Tick whatever is true of your project — there is no wrong answer here.

02Sizing up a job?

Pick what you are building — data centre, pharma, warehouse, offices or apartments — drag the size once, and see the cost, the hours and how many people that is on site.

Building typesFive
You getCost · hours · people
ThenScope & programme
Open the sizing tool

Built on published construction cost and manhour benchmarks. Indicative only.

Neither is a test. Both are just a way to make the first call useful for both of us — and if we are not the right fit, we will say so and point you somewhere better.

Your job, on our board

Tell us three things. Watch it draw.

Pick what you are building, drag the size and the programme. The sheet plots your footprint, your float and what one week late costs you. Take it with you.

01 · What are you building?
02 · Construction value
€12m€0.5m – €250m

Roughly 6,000 m² of building

03 · Programme on site
62 weeks12 – 160 wks

About 14 months on site

Medium exposure

Send us this sheet
Indicative project sheet — Haperty Shubhtec

Indicative only, built on published construction cost and manhour benchmarks and our own phasing model. It is a starting point for a conversation, not a quotation.

How we work

Plan. Control. Handover.

See the full process
01 · PLAN

Agree what good looks like

Scope, budget, programme and the risks written down before anyone breaks ground — so there is a baseline to measure against.

02 · CONTROL

Hold it week by week

One programme, one cost report, one person accountable. When something slips you hear it from us first, with what it costs.

03 · HANDOVER

Finish it properly

Commissioning, snags and documentation closed out to zero, so the building works on day one and you can prove it.

Structurally sound. And sound to deal with.

Two things worth having in the same firm. Bring us a project and we'll tell you straight what we think of it.

Talk to us